New Mix Ready Mix Industry
About Us
New Mix Ready Mix was set up in the year 2004 in Abu Dhabi and within a short period of its operation has been successful in establishing itself as one of the major players in the field of concrete supplies. This achievement is obtained by adhering to strict professional standards with unflinching dedication to the commitments at hand. Our set ups exist in Mussafah Industrial Area (M35).
Equipment
We use the best equipment with the latest technology
Batching Plants
Amount: 4 plants
Total Capacity: 580 m3 /h
Transit Mixers
Amount: 50 mixers
Total Capacity: 530 m3 /h
Concrete Pumps
Amount: 17 pumps
Boom Length: 38-55m
We are a ready mix concrete company that leads the industry with our mixed design
Our Projects
New Mix focuses on the concept of appropriate technologies which suite the environmental, cultural and economical situations they are intended for, and the technologies are not direct products of Science, because they have to satisfy such requirements as: utility, usability and safety, therefore the application of the scientific knowledge to concrete purposes requires the contribution of engineering research.
Project: Bloom Living Phases 1&2 Piling
Contractor: Edrafor Emirates
Consultant: House of Engineering Consulting
Project Value: 9,000,000,000Dhs.
Project: Police Staff Accomodation Buildings in Mussafah & K.T.A
Contractor: Bin Ojan
Consultant: Arab Expert
Project Value: 56,000,000.00 Dhs.
Project: Emirates National School
Contractor: Ghantoot
Consultant: Future Architectural
Project Value: 118,000,000.00 Dhs.